Return on Investment
ROI 17%
Payback Period
6 Years
Modern Tropical Loft Concept
Discover a modern loft concept designed for tropical living in the residential area of Tumbak Bayuh. This exclusive development features a private compound of 33 lofts, combining comfort, functionality, and strong investment potential.
Ideally located just 400 meters from the future mall and 9 minutes from the beach, the project benefits from a strategic and fast-growing location.
Each loft includes a sunken sofa living area, a fully equipped kitchen, a mezzanine bedroom with private bathroom, and a private outdoor pool, offering a seamless indoor-outdoor lifestyle.
Perfect for expatriates and those looking to live or invest in Bali.
Villa Specifications
Each villa is designed for comfort, efficiency, and modern tropical living:
- Land Size: 34 sqm
- Building Size: 42 sqm
- Optimized layout with functional living spaces
- Open-plan design maximizing natural light and airflow
- Contemporary architecture with minimalist finishes
- Access to shared infrastructure and well-organized pathways
A Strategic Location in Pererenan
Only 3 minutes from Obsidian 2, Loft 1 Chamber is
- 9 minutes from Pererenan Beach
- Close to trendy cafés, restaurants, yoga studios, and coworking spaces
- In a calm yet high-growth neighborhood loved by expats and digital nomads
Property Highlights
Development Overview
Construction Progress — 1 years of work completed
Initial Payment - 10%
The first payment of 10% is due in July 2026, marking the start of the building process and securing the construction commitment.
Second Installment - 30%
The second installment of 30% is scheduled for August 2026. This supports the major early-stage construction works such as foundation and structural progress.
Third Installment - 20 %
The third payment of 20% is due in November 2026, aligned with mid-stage construction milestones and structural completion.
Fourth Installment - 20 %
The third payment of 20% is due in November 2026, aligned with mid-stage construction milestones and structural completion.
Fifth Installment - 15 %
The fifth payment of 15% is due in May 2027, supporting final finishing, installations, and quality checks.
Final Settlement - 5 %
The last payment of 5% is due in July 2027, upon completion and handover of the building.